We are currently running an ad campaign on selected Suburbs of Melbourne for a full Bathroom Renovation package offer. To take advantage of this offer, you must show the flyer on the day of consultation.

***Showroom visits are by appointments only.***

Terms &
Conditions

Please Note:

Our website address is: https://oda.com.au. We are ODA. We trade under ODA Group Pty Ltd, ODA Homes and ODA Property Group. These are registered companies with trademarks and IP. Images used to represent the bathroom renovation offer are for illustration purposes only. Decorative accessories are not included. Terms and conditions can change at any time without notice, ODA holds the right to reject/refuse any client for reason of confined space due to but not limited to stairs, elevators, access to the property, bathroom etc. 14 business working days Monday to Friday only 7am till 3:30pm, Saturdays can be met with arrangement between ODA personnel and client. Every attempt is made to ensure stock availability of all items. If there are stock shortages, ODA may swap or alter the offer or withdraw any combination. Up to date terms and conditions can be viewed at www.oda.com.au/terms

Inclusions

10 Year Structural Warranty
2 Year Non Structural Defect Guarantee
10 Million Public Liability Insurance
10 Year Waterproofing Guarantee

Demolition and removal of existing fixtures and fittings.
Replaster walls with water resistant plasterboard shower area only.
Waterproofing to floor area and shower walls only.
Supply and installation of tiles up to 14sqm.
Tiles supplied are 9sqm Gloss plain white 300×600 for wall and 5sqm floor tile “Baseline” range 600×600.
Painting of ceiling up to 5sqm.
Plumbing fit off only.
Caulking of all joints.
Full Bathroom Clean.

Bathroom ware inclusions.
Base Mk2 Basin Mixer Chrome
Base Rail Shower
Base Mk2 Shower Mixer Chrome
Shower Screen Fixed Panel (900 x 1950 x 6mm)
Toilet Posh Dominique CC Suite
Base Toilet Holder
Vanity 600mm White Floor Mount with Laminex Bench Top
Edge Mirror 450mm x 600mm
Mizu 600mm Single Towel Rail

Exclusions

No structural modification/position of the walls or floors are included in the offer.
No plumbing pipe upgrades or electrical upgrades are included in the offer.
No modification in the plumbing position.
No screeding of floor(s) are included in the offer.
No electrical works are included in the offer.
Pricing does not include removal of asbestos or other dangerous goods.
No bathtub is included in the offer.
Price does not include any water damages, termite damages or structural repairs.
And anything else that is not listed above in the inclusions list.

Disclaimer – Reuse of Existing Fixtures and Fittings

Where existing fixtures and fittings (including but not limited to vanities, toilets, tap ware, basins, shower screens, mirrors, and accessories) are to be removed and reinstalled or reused as part of the renovation works, all reasonable care will be taken during the removal process. However, due to the nature of removal, age, wear, or previous installation methods, ODA accepts no liability for any damage, breakage, or deterioration that may occur during removal, handling, or reinstallation.

Clients are advised that certain items may not be suitable for reuse due to structural integrity, outdated standards, or incompatibility with new works. Should any items be deemed unfit for reuse during construction, the cost of replacement or alternative fitting will be at the client’s expense and may affect the renovation schedule.

Payment terms

Client must sign an agreement and pay 5% deposit before any works are able to commence.
60% to be paid when plumbing roughing are installed at client’s premises/bathroom.
30% to be paid after tiling works has been completed.
Final of 5% payment on the day of completion.